Material Engineering Services
– Failure Analysis of Materials
– Fractograhic Mechanism of Failures
– Determination of Material Characteristics
– SEM / TEM Examinations
– EDS Analysis
– Metallographic Examination
– Determination of Grain Size
Determination of Mechanical & Chemical Properties
– Chemical Analysis
– Tensile/Compression Test
– Hardness Tests
– Guided Bend Tests
– Fracture Toughness Tests
– Charpy Impact Test
– CTOD Tests
– Drop Weight Tear Test
– Nick Break Test
– Fatique Test
Welding Engineering Services
Qualification of Welded Processes
– Preparation of Welding Procedure Specifications (WPS)
– Procedure Qualification Records (PQR)
Qualification of Welded Production Processes
– Preparation of Manufacturing Procedure Specifications (MPS)
– Qualification of Manufacturing Procedure Specification (MPQT)
KQualification of Welding Personnel
– Qualification of Welders and Welding Operators (WPQR/WOPQR)
– Qualification of Repair Welders (RWPQR)
Welding Eng. Services for Welded Seam Pipes
– Manufacturing Procedure Specification (MPS) and Procedure Qualification (MPQT) for Welded Steel Pipes
– WPS and PQR Activities for Welded Pipes
– Inspection and Test Plan (ITP) for Welded Pipes
– Quality Control Methods of Welds for Welded Pipes
– Preparation of Quality Control Files of Welded Pipe Production
– Quality Control Services of Welded Structural Products
Corrosion Engineering Services
– The Fundamental of Corrosion
– The Methods of Corrosion Protection
– Corrosion Analysis & Corrosion Mapping
– Sour Service Corrosion Failures
– Analysis of Hydrogen Induced Cracks in Wet H2S medium in Oil and Gas Pipelines
– Sour Service Corrosion Failures
– Sour Service Corrosion Tests (HIC, SOHIC, SSC Tests etc.)
Coating / Painting Quality Services
– Application of Coating Procedure Specification (CPS) and Procedure Qualification (CPQT) for Steel Pipes
– Qualification and Certification of Coating/Lining Operators
– Coating / Lining Applications for Welded Steel Pipes
– Quality Control Inspection and Test Methods of Coated / Lined Welded Steel Pipes
– Application of Coating / Lining Inspection and Test Plan (ITP) for Steel Pipes
– Preparation of Quality Control Files of Coated / Lined Steel Pipe
Resolutions for Technical Claims in International Projects
– Determination of Problems Leads to Claims
– to reporting analytic solutions of problem to related parties
– to propose effective solutions regarding this claim in accordance with agreed project standard and project specification
The Establishment of Inspections & Test Systems
– Preparation of Inspection & Test Plans (ITP)
– Validation of Special Processes
– Process Approach and Process Interactions
– Quality Plans and/or QC Procedures
– Monitoring and Measuring Procedures
– Maintenence and Calibration Procedures
– Reporting & Certification
– Preparation of Quality Documentation Files
Production Manual acc. to CE Directives
– Preparation of Production Manuals acc. to 2006/42/EC Directive for Machine Equipment